Is Dakshineswar metro open today?

Is Dakshineswar metro open today?

On Saturdays (from 11.09. 2021) 178 Maintenance Special Services (89 UP & 89 DN) will be run instead of 172 Maintenance Special Services only for the essential staff from 08:00 hrs to 22:30 hrs without any break between Kavi Subhash and Dakshineswar. East –West Metro services will remain unchanged.

How do I get to Dakshineswar by metro?

Note, for now, only selective metro trains between 7am and 9.30pm will run between Kavi Subhas and Dakshineswar and vice versa. According to the Indian Railways, it will take around 62 minutes to reach Dakshineswar station from Kavi Subhas station and 32 minutes from Esplanade station of the Metro Railway.

Is Dakshineswar metro running?

Construction for the station and the section started in 2017. In December 2017, the metro line to the Dakshineswar station was projected to be operational by May 2019. Trial runs for this stretch started on 23 December 2020, after delay due to COVID-19 pandemic. The station was inaugurated on 22 February 2021.

What is the name of Dakshineswar metro station?

Dakshineswar Metro Station is a terminus station on the Blue Line of the Kolkata Metro and is located at Kolkata….Dakshineswar Metro Station.

Station Name Dakshineswar दक्षिणेश्वर
Station on Line Blue Line
Station Layout Elevated Station
Platform Type Side Platform
Located In Kolkata Region

What time is the last Metro today?

Last Train Timings For The Last Metro Stops On The Red Line

Day Last train from UAE Exchange to Rashidiya Last train from Rashidiya to UAE Exchange
Saturday to Wednesday 10:55 pm 10:54 pm
Thursday 01:56 pm 11:56 pm
Friday 11:53 pm 11:53 pm

Is Dakshineswar Metro open on Sunday?

On Sundays, there will be 112 services (56 in each direction) between Kavi Subhas and Dakshineswar stations, running at 10-minute intervals during the morning and evening peak hours. The last train will leave Kavi Subhas and Dum Dum stations at 9pm and from Dakshineswar at 8.48pm.

What is the starting time of Kolkata Metro?

7.30 AM to 10.30 PM
With 266 trains, Kolkata Metro operates from 7.30 AM to 10.30 PM as of now, TOI revealed in its report.

How many stations noapara to Dakshineswar?

Line 1 (North-South Corridor)
No. Station Name Layout
1 Dakshineswar Elevated
2 Baranagar
3 Noapara

Is Kolkata Metro open for all now?

Kolkata metro services will remain operational between 7.30am and 10.30pm daily. No change, however, has been made to the timings of the first and the last metro train of any given day.

How many metro stations are there?

254 metro stations
As of now, there are a total of 254 metro stations including the Airport Express stations….Metro stations.

Terminal station
* Transfer station
†* Terminal and transfer station to other lines
†† Transfer station to Indian Railways / ISBT

What time does metro open Friday?

New working hours for centres The working hours will be from 7.30am to 3.30pm, except on Fridays, when they will close at noon. RTA’s service providing centres (technical testing centres) will continue to operate from Sunday to Thursday and will be closed on Saturdays. On Fridays, they will open from 4pm to 9pm.