How many hydropower projects are there in Himachal Pradesh?
Hydro Electric Projects in Himachal Pradesh
# | Name | River |
---|---|---|
4 | Baner Hydroelectric Project | Baner Khad |
5 | Baspa Hydroelectric Project Hydroelectric Project | Baspa |
6 | Bassi Hydroelectric Project | Beas |
7 | Bhakra Hydroelectric Project | Satluj |
In which district of Himachal Pradesh is hydroelectric located?
Kullu district
It is situated in Kullu district.
Which is biggest power project in Himachal Pradesh?
Nathpa Jhakri Project
HP GK – Hydroelectric Power Project in Himachal Pradesh
Sr No. | Project | Capacity(MW) |
---|---|---|
1 | Nathpa Jhakri Project | 1500 |
2 | Bhakra Nangal Project | 1325 |
3 | Karcham Wangtoo Project | 1000 |
4 | Dehar Hydroelectric Project | 990 |
Which is the executing agency of baspa 2 hydroelectric project of HP?
300 MW Baspa Stage II Project is the first Independent Power Producer (IPP) project after the Government of India liberalized the power policy by inviting private sector participation for setting up hydropower project on “BOO” basis….Baspa II Hydroelectric Project, HP, India.
Contributor: | Daniela Del Bene, ICTA-UAB ([email protected]) |
---|---|
Last update | 18/08/2019 |
Which is the oldest hydro electric project in Himachal Pradesh?
Shanan Project
Detailed Solution. The correct answer is Shanan (Joginder Nagar). Shanan Project is the project Oldest Hydro Electric Project in Himachal Pradesh.
Which is the smallest river in HP?
Highest,Largest,Longest and Smallest in HP:
Largest District Area-wise | Lahaul-Spiti |
---|---|
Smallest District Area-wise | Hamirpur |
Smallest District Population-wise | Lahaul-Spiti |
Smallest River- lengthwise | Yamuna |
Smallest Wildlife-sanctuary | Shilli (Solan) |
Which is the highest peak of HP?
Districts
District | Highest Peak | Height (m) |
---|---|---|
Kinnaur | Reo Purgyil | 6,816 |
Lahaul and Spiti | Gya | 6,794 |
Kullu | Parvati Parbat | 6,632 |
Chamba | Menthosa | 6,443 |
Which is the executing agency of Uhl 3 hydroelectric project of HP?
Beas Valley Power Corporation
The project is being executed by HPSEBL-run Beas Valley Power Corporation (BVPC).
Where is Baspa hydro electric project?
Kinnaur District
The project was fully commissioned on 8th June, 2003 and has since been generating power. The project is located on the river Baspa, a tributary of river Satluj in Kinnaur District of Himachal Pradesh.